The Client wanted this building to be delivered within a reduced timescale. It’s a medium-sized project so we sought to maximize the opportunities of repeat design. This can be done in a number of ways. Stacking units within the overall plan will help efficiency of MEP layouts, for instance. This procedure is a win for the developer. The whole building solution embodied the modular ethos. The final project is a sum of a reduced number of better- designed parts. The additional benefit of such approach is that the contractor can finish buildings to a higher standard as he is not learning how to construct so many numerous building elements during construction of the project.